Ability to set a fixed number in a workload to analyst's distribution.
Currently, the analyst distribution step in a workload only lets us distribute a percentage of the estimated interaction volume to be assigned. We need to be able to set a fixed number for each QA analyst to distribute the estimated volume. That way, across multiple workloads every week we can determine their total assignment.
13
votes
