Adherence or Conformance by Channel/Workstream
a new metric that can show the adherence or conformance at the agent, date, time/interval level. This metric would be a percent of how much time was productive in a channel vs scheduled.
% = Total Time Active in Task or Channel / Total Time Scheduled in Task or Channel
1
vote
